argunix

checks.x86_64-linux.eval-smoke

← eval #14

system
x86_64-linux
status
success
started
2026-06-10 13:25:42 UTC
finished
2026-06-10 13:25:45 UTC
total
2s
derivation
/nix/store/51l1hjgdzxiyz65i19pfyala371qynzb-argunix-eval-smoke.drv
output
/nix/store/9vyr52bvv4mxqnlfm7z61yrvpw4fsmwg-argunix-eval-smoke

transport & build

Time and data spent uploading the build inputs to the builder, running the build, and downloading the outputs back. Bytes are measured between argunix and the builder; the build duration is the build itself, not including transfer.

phase duration bytes
push (drv closure → builder) 952 ms 286.39 KB
build (net, on builder) 1s
pull (output closure ← builder) 141 ms 920 B

view build log