argunix

checks.x86_64-linux.eval-smoke

← eval #21

system
x86_64-linux
status
success
started
2026-06-12 11:56:38 UTC
finished
2026-06-12 11:56:38 UTC
total
706 ms
derivation
/nix/store/wv3vagkjy24abs44b6w4z3sj61y5wnmm-argunix-eval-smoke.drv
output
/nix/store/2nryngln4jx8jqyzyv88i4rrvarv6f0q-argunix-eval-smoke

transport & build

Time and data spent uploading the build inputs to the builder, running the build, and downloading the outputs back. Bytes are measured between argunix and the builder; the build duration is the build itself, not including transfer.

phase duration bytes
push (drv closure → builder) 292 ms 206.80 KB
build (net, on builder) 277 ms
pull (output closure ← builder) 94 ms 920 B

view build log